Microcement bonds directly onto the tile you already have. No demolition, no dumpster in the driveway, no three weeks of dust through the house. Days on site, and one continuous surface at the end of it.
Microcement is a multi-layer system applied by hand, a few millimeters thick, bonded onto the surface that is already there. On a tile job the tile never leaves the house.
The sequence is the same every time. The existing tile gets cleaned and checked. Anything loose comes up and gets made good. A bonding primer goes down, then reinforcing mesh across the whole area, then two base coats, each sanded flat. Then two color coats, each polished. Then two coats of sealer.
By the time the base coats are flat, the grout lines are gone. Not covered over and still faintly visible, gone, because the mesh and the base coats bridge them and the sanding takes the whole plane level before any color goes on. That step is the one cheaper systems skip, and it is why their grout lines ghost back through in a year.
Total build is a few millimeters. Door clearances, thresholds and appliance heights barely move, which is the practical reason this works in a finished house where ripping the floor out would mean moving doors, trim and cabinets too.
Tearing out tile is the dirtiest, loudest and most expensive week of a remodel, and it is the week that discovers problems. Skipping it removes the dumpster, the dust barriers, the debris haul and most of the surprise.
Mesh and two sanded base coats bring the whole area to one plane before color goes down. No telegraphing, no ghost lines, no pattern showing through a year later.
This is where we will tell you no. Tile that is drummy, lifting, or sitting over a slab that moves is not a candidate until that is fixed. It gets checked before a number is written down rather than discovered halfway through.
No demo crew, no tile setter, no waterproofer, no scheduling between three of them. Michael quotes it and Michael applies it.
The honest version: this is not a shortcut. It is the same multi-layer system that goes on new construction, applied to a surface that happens to already have tile on it.
Most tile in a South Florida house is a candidate. A few things are not, and you should know which is which before anyone quotes you.
The most common case and the most straightforward. Glazed or unglazed, matte or polished, it makes no difference once the primer is on.
Yes, including filled and honed travertine. Natural stone takes the system well as long as it is bonded and dry.
Both work. Wide joints in a mosaic need more base coat to bring level, which shows up in the quote as area and prep, not as a surprise.
Tap it and it sounds hollow, it comes up first. We make that area good, then go over the whole floor. It is normal and it is quoted.
This is the one that gets a no until the slab is addressed. A finish a few millimeters thick cannot hold a substrate together, and we will not pretend otherwise.
Moisture coming up through a slab has to be solved before anything goes over it. We check for it rather than assume.
If your tile is in the last two groups, you will hear that on the call rather than after the deposit.
Nothing was torn out to get from the left side of this image to the right. The tile is still under there.
Drag the handle, or use the left and right arrow keys.
The calculator asks for square footage and which surfaces you are doing, then emails you a real range in about a minute. You get it in writing without talking to anyone first.
No stock imagery, no renders, no borrowed portfolio. These are South Florida homes Michael finished himself.





Monarch was founded by Michael Daniels, a U.S. Marine Corps veteran and one of the first certified ForCrete installers in the country. He trains new applicators for ForCrete Americas, and he leads every Monarch project personally alongside a crew he trained himself.
Going over existing tile is the part of this work where judgment matters most. Knowing which tile is sound, which needs lifting first, and which job to turn down is not written on the bucket. He lives in Deerfield Beach and works from Miami up through Palm Beach, and when you call, you talk to him.
Book a free consultationPricing runs on the total surface area you are covering and on which system that surface needs. A floor is a different build from a shower, and the shower decides that, not us.
Going over tile does not carry a surcharge. It is usually the cheaper path, because you are not paying for demolition, debris haul or the week of labor that goes with them. What does move the number is prep: a floor with a lot of drummy tile takes more hours before the primer goes down.
There is a calculator on the home page that gives you a real range in about a minute, and it emails you the breakdown so you have it in writing. It is a range, honestly labeled as one. The firm number comes after somebody stands in the room.
Per square foot of total surface area for most floor, wall and ceiling work. Bathrooms begin around $6,000.
Because there is no demolition. No dumpster rental, no debris haul, no week of labor to pay for.
A single bathroom is typically 6 to 8 days on site. Your written estimate carries the number for your actual scope.
In most homes, yes, and that is the normal way we do this work. Ceramic, porcelain, travertine and marble all take the system. What we need is tile that is bonded, stable and dry. Anything drummy or lifting gets made good first, which is part of the quote rather than a surprise.
Not with this build. Reinforcing mesh goes over the whole area, then two base coats, each sanded flat, which brings everything to one plane before any color goes down. Grout lines telegraph back on systems that skip the mesh or the sanding. Ours does not skip them.
A few millimeters in total. In practice that means doors, thresholds and appliance clearances barely move, which is exactly why this works in a finished house. If a specific threshold is tight, it gets measured at the site visit.
Loose tile comes up and the area gets made good before anything goes over it. That is routine. Tile that is cracking because the slab underneath is moving is a different problem, and we will tell you that rather than go over it and watch it come back.
The system we install is an epoxy-based microcement, so unlike air-cured products there is no shrinkage as it cures, and it has very high tensile and compression strength. It will not fix a substrate that is unstable or damp underneath, which is exactly what gets checked before a number is written down.
A single bathroom is typically 6 to 8 days on site. A multi-room project, or all the floors in a home, usually runs 8 to 12 days. A whole home is 2 to 4 weeks. Because there is no demolition phase, the schedule is short and predictable.
Answer a few questions about the room, then pick a time. Thirty minutes on the phone with Michael, who will tell you on the call whether your tile is a candidate.
Michael is based in Deerfield Beach and runs every project personally. Pick your city for the neighborhoods we cover and the work we have done there.
Not on the list? Ask. If it is between Miami and Stuart the answer is almost always yes.
We also do Venetian plaster, showers and bathrooms, countertops and floors.
Tell us about the room and pick a time. Thirty minutes on the phone with Michael, who will ask what is on the floor now and give you a realistic range on the call. Nothing is booked until he has seen the surface in person, and that visit costs nothing either.
Tell us about your space Get a ballpark firstOr call and text (561) 288-2474